Resources
Browse our ever-expanding library of useful articles, case studies, videos, webinars, and more.
Featured
Revitalized Bourbon Distillery Merges Tradition With Innovation
Bourbon distillery Castle & Key implemented Ignition at their facility in Frankfort, Kentucky, with the help of Gray AES to replace an outdated FactoryTalk system. The mobile-responsive Ignition application was Gray AES’ first large-scale project using Perspective, featuring a high-performance HMI, alarming, and reporting, but most importantly access to historical data.
10 min video
Driving Efficiency and Visibility at rPlanet Earth
rPlanet Earth partnered with Kanoa to implement Kanoa MES — a modular, composable manufacturing execution system built specifically for Inductive Automation’s Ignition platform.
7 min read
Clovis Community College Puts Industry 4.0 Into The Hands Of Students & Teachers
Next to the robotic arms, the off-the-shelf miniature smart homes may not appear to be a key part of Clovis Community College’s Automation, Robotics & Mechatronics lab, but this unassuming hardware is providing students and instructors alike with a unique opportunity to build industry-grade automation applications.
12 min video
Phased Deployment Methods
By leveraging common design patterns and standardized templates, teams can accelerate deployments while maintaining consistency across each environment.
1 min read
NERC CIP Best Practices with Inductive Automation and Ignition
This guide addresses best practices for using Ignition and working with software vendors in a CIP-compliant way, with recommendations based on specific CIP standards.
1 min read
Data Centers: How DCIM Improves Your Daily Operations
In this webinar, experts from Inductive Automation and ATS Global will look at those common requirements and present how an open data center infrastructure management (DCIM) solution based on Ignition can help you to comply, and maybe even change the public opinion about Data Centers in the long term. We’ll also present a new Ignition demo for data centers.
46 min video
See the New Ignition Data Center Demo App
Made specifically for the Data Center industry, the new demo app is a highly realistic, detailed view of what a real Ignition project for data centers looks like.
1 min read
Data Center Supports Continuous Improvement Through SCADA Synchronization
Vantage Data Centers’ goal for this project was to design and deploy an Ignition Perspective system for multiple data centers across Europe, the Middle East, and Africa (EMEA), used for both system control and monitoring, as well as supporting operational excellence and continuous improvement.
5 min video
Collaborating on Digital Transformation for Enterprise Scale!
A panel of longtime Ignition users and integrators discuss the challenges and successes of tackling Ignition deployments at an enterprise scale. Learn about how collaboration with other integrators can unlock opportunities to take on global projects. We will discuss what it's like to have three to four different companies working together to complete a project and how to make sure the customer's needs are always front and center.
29 min video
Advanced Monitoring and Control for a Data Center Leader in Italy
This project provided Aruba with an advanced real-time monitoring and control system for its revamped IT2 Arezzo Data Center. This was Aruba’s first data center, put into operation more than 15 years ago, covering approximately 2,000 square meters.
5 min video
Project Scope
- Tags: approx. 124,000
- Screens: 190
- Clients: approx. 30 daily active clients, 4 dedicated terminals
- Alarms: approx 50,000
- Devices used: More than 250 devices such as ABB AC500 PLCs, Socomec UPS, Pramac gensets, ABB Network Analyzers and MV Relais, Honeywell Firefighting Systems
- Architectures used: Standard Ignition Architecture
- Databases used: MySQL database
- Historical data logged: 15 billion rows, 40,000 historical tags, 2 years data retention, week partitioning
Project Overview
This project provided Aruba with an advanced real-time monitoring and control system for its new Global Cloud Data Center (ANSI/TIA 942 Rating 4 compliant), the largest data center campus in Italy (200.000 sqm).
Problem
Aruba wanted to build a modular and flexible data center designed primarily to offer its Italian and International customers colocation services. Aruba needs to control all its subsystems from a single fully integrated system.
The system includes:
- Data center electrical power distribution (medium voltage - low voltage) and continuity (UPS, batteries, and gensets)
- Renewable electrical power production (hydroelectric and photovoltaic)
- Data center firefighting and flooding (with more than 100 sensors)
- Geothermal use of groundwater for data rooms cooling with traditional chillers in backup
- Ambient conditions monitoring (temperature, humidity, air quality)
- Building automation (lighting, HVAC, and access management)
All this data collection and interaction must lead to:
- Plant monitoring
- Remote commands
- Automatic management procedures
- Real-time alarms, pipelines, and notifications
- Long-term historian
- Power consumption analysis
- Data center KPIs
- Maintenance
Solution
Ignition allowed MTech to easily connect to all the devices installed in the plant and collect a huge amount of data in a structured way (using UDTs). Developing PLC software with Ignition UDTs and templates in mind allowed MTech to create PLC elements using an object-oriented approach.
Some mandatory customer requirements were:
- Detailed graphic interface
- SQL database data storage
- Multiple concurrent clients access
- Structured alarm notification
All these were fulfilled by Ignition, and unlimited tags/clients licensing gave space for future (and really fast) growth of the system.
The solution includes:
- Audit log
- Scheduled data export (reports)
- Third-party software data access
The next step will be integrating Ignition Perspective (keeping in production the previously existing Vision pages) to give universal access to the system, especially from mobile devices. This integration will lead to new features, such as interactive maintenance.
Results
Ignition has shown its capability to be a flexible platform for creating powerful and beautiful HMIs, allowing developers to use incredible scripting with ease. Data collection is extremely reliable, and level of performance is satisfactory for end users even with massive amounts of data (billions of historical samples).
Online changes have guaranteed that Aruba will not need to interrupt its services in any case. Final cost of the entire Ignition solution is less than any “traditional” SCADA solution.
<p><strong>Website:</strong> <a href="https://www.mtech.srl/" target="_blank">www.mtech.srl</a>


Firebrand Awards Panel (2018)
At the end of each conference, the Ignition Firebrand Awards are given to the most outstanding real-world Ignition projects featured in our yearly Discovery Gallery project showcase. Join us to celebrate the creative spirit of the Ignition community as we honor this year’s Firebrand Award winners and hear their stories of struggle, innovation, and triumph in a fun and informative panel discussion led by Inductive Automation’s chief strategy officer, Don Pearson.
55 min video
Greater Access to Info Across 22 Data Centers
This project was a colocation data center HMI for electrical power distribution, thermal management and capacity planning. It provides navigation, equipment detail, history, trending, notifications and alarms.
5 min video
Integrator Panel: New Technologies & Trends
Join a panel of the leading integrators of Ignition as they discuss the newest technologies and trends that are shaping the industry. Learn from their first-hand experience and get your questions answered about how to leverage Ignition to meet the technology and development demands of the ever-changing industrial sector.
68 min video
Accelerate IIoT Solution Deployment Using Ignition & MQTT
Watch this ICC Community session from ICC 2016.
59 min video
Industry Panel: Using Ignition to Accelerate Growth
In this panel discussion, you'll hear from end users of Ignition in a variety of industries. Each brings their own unique perspective about how Ignition is helping them meet the demands inside their organization to facilitate innovation, productivity, and growth.
61 min video
Leveraging IIoT Technology: Building for Tomorrow with Ignition & MQTT
MQ Telemetry Transport (MQTT) was invented in 2001 as a TCP/IP message transport designed specifically for event-based real-time SCADA. MQTT remained relatively obscure until the recent emergence of M2M/IIoT technologies in the development community at large. Now MQTT is one of the leading message transports in IIoT. This session introduces a high-level explanation of MQTT, why it was invented for SCADA, and how it can be used natively in Ignition, right now.
56 min video
Large Data Center, Manageable System
After a number of vendors failed to show American Internet Services (AIS) a system versatile enough for its needs, the company turned to Brown Engineers, a mechanical and electrical consulting firm it had worked with on other projects. Brown Engineers suggested a modular software platform called Ignition by Inductive Automation®.
5 min video
Integrator Panel Discussion (2014)
Discover the power of the Ignition integrator community and gain valuable tips for success at this session.
60 min video